Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.5

Around 08 UT on HR 718 = ksi2 Cet, jump in RA: added 2 integrations to patch to compensate.
Thanks to Marco Bonati: the EM is back since Friday September 13th.
Attention: tonight it took 3 tries for the dome shutter to close. Again heard the "snap!" sound.