Target of Oportunity:
No
Time Observed:
11.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.75

The program was completed successfully + HIP057058, HIP072044 and HIP 092444.
No data from DIMM tower the third quarter of the night.