Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.5

Partially overcast the first half of the night.
Thin clouds the second half of the night.
Few data from the DIMM tower, as a reference the seeing values from the 1.3m telescope are: seeing (Beginning of Night)= 2.3, Seeing (Middle of Night)=1.9 and Seeing(End of Night)=1.5.
The program was completed successfully.