Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
At approximately 02:20 UT Leonardo noticed some noise in the spectra, then I went to check the instrument in case the vacuum sensor was off, it was on!. I turned it off and the observations continued according to the program.
The program was completed succesfully.