Target of Oportunity:
No
Time Observed:
1.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
9.5
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
thenry88@gsu.edu [1]
Institution:
SMARTS
Instrument:
CTIO 0.9m CCD Direct
Organization:
SMARTS
Total Program Time:
11
Overcast the most of the night.
I left calibrations running at the end of the night.
No data from the DIMM monitor
The dewar was filled at 03:00 and 10:30 UT.