Date:
Wednesday, December 1, 2021
Telescope:
CTIO 1.5-m
Submitter:
Roberto Aviles
Submitter Email:
Observer Support:
None
Night Assistant:
None
Problems:
CHIRON was found frozen (neither morning nor afternoon calibrations.)
Around 00:50 UT while moving to HD196446, lost the pointing.
GAI2136-5434_gap ~ 01:50 UT telescope stops tracking: "No response from TCS" + "No response from TCP". Rebooted Linux machine, found /tmp was full. Hernan and Javier deleted one big file and added an extra power supply (TCS_V was ~ 4.6 and now 5.1V.)
GAI2136-5434_gap failure: integration interrupted and no cal lamp. Needs to be repeated.
Program:
Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
4.75
Time Engineering:
0.0
Time lost technical:
3.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2021-12-01 | 4.75 | 0.0 | 3.5 | 0.0 | 0.0 | 8.25 |
No time for: GAI2136-5434_gap, TIC206361691, HIP008102, G2K000327, TIC404518509, TOI2606.01, T0446370039, HIP 53524.
Integration of '2MASSJ07243824-4542491' ended with the Sun at -9.9 degrees of altitude.