Problems:
First Half
=======
At 23:54 mirror lost air support. Electronic technicians repaired. Resumed observations at 00:21.
At 2:58 TCS lost communication, stopped queue while tel ops resumed communication. Resumed observations at 3:07.
Second Half
==========
At 2:15 (Local Time), the telescope moved to the next target but the dome didnt. The telescope sat idle for about 5 minutes.
At 2:20 exposure 901483 was started with the telescope pointing to the dome.
At 2:30 we started normal operations.
At 2:31 4MAP control 32 MAMAC failed and David Rojas got up to fix it.
At 3:42 we started observations.
Program:
Proposal:
2019A-0305
Target of Oportunity:
No
Time Observed:
4.25
Time Engineering:
0.0
Time lost technical:
0.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Local Volume Exploration (DELVE)
Primary Investigator:
Alex Drlica-Wagner
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5
Proposal:
2019B-0323
Target of Oportunity:
No
Time Observed:
3.0
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
The DECam eROSITA Survey (DeROSITAS)
Primary Investigator:
Alfredo Zenteno
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.5
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-10-07 | 7.25 | 0.0 | 2.25 | 0.0 | 0.0 | 9.5 |
None.