Date:
Sunday, September 29, 2019
Telescope:
CTIO 1.5-m
Submitter:
Roberto Aviles
Submitter Email:
Observer Support:
None
Night Assistant:
None
Problems:
Is pending to solve the problem of the slicer motor and then align the optical fiber.
Program:
Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
10.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
21
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-09-29 | 10.5 | 0.0 | 10.5 | 0.0 | 0.0 | 21 |
DIMM2 is down.