Date:
Wednesday, September 6, 2023
Telescope:
CTIO Blanco 4-m
Submitter:
Karleyne Silva
Submitter Email:
Observer Support:
Guillermo Damke
Night Assistant:
Hernan Tirado
Also Present:
Alberto Alvarez
Problems:
During earthquake, the power was down/ or unstable and the UPS of the observer computer on the base observing office did not work, and the computer turned off. Other then that, all worked fine, just had to restart the computer.
Program:
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-09-06 | 0.0 | 0.0 | 0.0 | 3.25 | 0.0 | 3.25 |
None.