Date:
Monday, May 15, 2023
Telescope:
CTIO Blanco 4-m
Submitter:
Erin Kado-Fong
Submitter Email:
Observer Support:
Guillermo Damke
Night Assistant:
Claudio Aguilera
Also Present:
Charlie Mace,
Problems:
About 1.75 hours lost to a cRio problem causing a false alarm in the ICS.
Program:
Proposal:
2020B-0288
Target of Oportunity:
No
Time Observed:
5.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Merian Survey
Primary Investigator:
Alexie Leauthaud
Email:
Institution:
UCSC
Instrument:
CTIO 4m DECam
Total Program Time:
5.75
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
1.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
Extending DESI to 17,500 Square Degrees
Primary Investigator:
Dey, Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-05-15 | 9.75 | 0.0 | 1.75 | 0.0 | 0.0 | 11.5 |
None.