Date:
Monday, May 24, 2021
Telescope:
CTIO Blanco 4-m
Submitter:
A. Zenteno
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Javier Rojas. Remotely: Alistair Walker & Marco Bonati
Problems:
We had a problem with pipeline2 at the start of the night. A reboot of the machine solved the problem.
Program:
Proposal:
2021A-0922
Target of Oportunity:
No
Time Observed:
10.25
Time Engineering:
0.0
Time lost technical:
0.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
The DECam eROSITA Survey (DeROSITAS)
Primary Investigator:
Jose L Nilo Castellon
Email:
Institution:
Universidad de La Serena
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
11
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2021-05-24 | 10.25 | 0.0 | 0.75 | 0.0 | 0.0 | 11 |
None.