Date:
Friday, March 6, 2020
Telescope:
CTIO Blanco 4-m
Submitter:
Kathy Vivas
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Rodrigo Hernandez
Problems:
Problem with communication with DECal. No calibrations were possible. See JIRA BLANCO-1196.
Weather station measurements in Environmental page have been intermitent in the last couple of days (it goes off for several minutes and then on again)
Program:
Proposal:
--
Target of Oportunity:
No
Time Observed:
0.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Starlink satellites
Primary Investigator:
Tim Abbott
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
0.5
Proposal:
2019A-0305
Target of Oportunity:
No
Time Observed:
4.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DELVE
Primary Investigator:
Drlica-Wagner
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.5
Proposal:
2020A-0058
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Is Crater II disrupting?
Primary Investigator:
K. Vivas
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
0
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2020-03-06 | 5.0 | 0.0 | 0.0 | 0.0 | 0.0 | 5 |
Good seeing all night.