Date:
Friday, December 20, 2019
Telescope:
CTIO Blanco 4-m
Submitter:
Burcin Mutlu-Pakdil
Submitter Email:
Observer Support:
Kathy Vivas
Night Assistant:
Claudio Aguilera
Problems:
Power Outage at 8:00 UT. The system could not restore itself. We lost half-hour.
Program:
Proposal:
2019A-0305
Target of Oportunity:
No
Time Observed:
3.0
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
DELVE Survey
Primary Investigator:
Alex Drlica-Wagner
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.5
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-12-20 | 7.0 | 0.0 | 0.5 | 0.0 | 0.0 | 7.5 |
None.