Date:
Wednesday, December 26, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Nathan Golovich
Submitter Email:
Observer Support:
Alfredo Zenteno
Night Assistant:
Jackie Seron
Problems:
Telescope control system crashed out and we had to point to zenith after clearing out my exposure queue. In total this cost about 18 minutes.
Also, the Blue Jeans meeting room that was provided did not work. Blue Jeans is the preferred method of communication for us when we remote observe, but there is almost always a problem. I used Skype with the telescope operator's iPad, and it worked fine.
We were alerted that the flats for g and VR were not taken before we started observing. Since we used both of these filters, may we have these flats taken in the morning?
Program:
Proposal:
2018A-0273
Target of Oportunity:
No
Time Observed:
7.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
black hole microlensing
Primary Investigator:
William Dawson
Email:
Institution:
LLNL
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.25
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-12-26 | 7.0 | 0.0 | 0.25 | 0.0 | 0.0 | 7.25 |
see above