Date:
Tuesday, August 28, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Arjun Dey
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Alistair Walker
Problems:
UT 23:17 Dome error at start of night. On/Off/On fixed this. 5 min of bright twilight time "lost"
UT 03:32 Frame 766567 was not taken because of SISPI hiccup when zero point correction was applied. No time lost.
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
6.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Legacy Survey (DECaLS)
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
6
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
4.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Star Flats
Primary Investigator:
A. Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.5
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-08-28 | 6.0 | 4.5 | 0.0 | 0.0 | 0.0 | 10.5 |
None.