Date:
Monday, October 23, 2017
Telescope:
CTIO Blanco 4-m
Submitter:
Bob Blum
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Problems:
Dome occlusion for a few sec (twice). Dome overslewed and corrected itself.
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
1.25
Time lost other:
0.0
Description:
DECaLS
Primary Investigator:
Schlegel/Dey
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
9.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2017-10-23 | 8.0 | 0.0 | 0.0 | 1.25 | 0.0 | 9.25 |
Conditions varied biggley.