You are here

ENR CTIO Blanco 4-m 2017-08-30

Primary tabs

Date: 
Wednesday, August 30, 2017
Telescope: 
CTIO Blanco 4-m
Submitter: 
Kathy Vivas
Submitter Email: 
Observer Support: 
Hernan Tirado
Night Assistant: 
Alberto Alvarez
Also Present: 
William Wester, Jessie Muir
Problems: 

Clouds after midnight

Comments: 

Prof. Veronica Espinoza (winner of the Padre Piccetti award) spend first part of the night with us in th econtrol room.

Second half: link to DES nightsum: http://des-ops.fnal.gov:8080/nightsum/nightsum-2017-08-30/nightsum.html

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.40
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
0
2nd Quarter
Clouds: 
Partially cloudy
Wind: 
Medium
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
6
3rd Quarter
Clouds: 
Partially cloudy
Wind: 
Medium
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
7
4th Quarter
Clouds: 
Partially cloudy
Wind: 
Medium
Seeing Value: 
1.00
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
7
Program: 
Proposal: 
2017B-0110
Target of Oportunity: 
yes
Time Observed: 
1.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
ToO
Primary Investigator: 
E. Berger
Institution: 
Harvard
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
1
Proposal: 
2017B-0253
Target of Oportunity: 
No
Time Observed: 
5.25
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Mapping the edge of the Milky Way
Primary Investigator: 
Jeff Carlin
Institution: 
LSST
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
5.25
Proposal: 
2012B-0001
Target of Oportunity: 
No
Time Observed: 
4.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DES
Primary Investigator: 
Frieman
Institution: 
DES
Instrument: 
CTIO 4m DECam
Total Program Time: 
4.5
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2017-08-30 10.75 0.0 0.0 0.0 0.0 10.75