Problems:
A DECAL failure at 10:29pm. Solved by restaring the DECAL computer.
We had 3 4MAP failure within 1 hour (at 12:18am, 12:50am and 12:59am). Rest of the night was ok.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
6.75
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-12-22 | 6.75 | 0.0 | 0.5 | 0.0 | 0.0 | 7.25 |
Some clouds at the begining of the night, changing to clear after 1am.