Date:
Wednesday, December 21, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
J. Allyn Smith
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Dillon Brout, Martin Murphy
Problems:
DTSQ alarms starting on 603315 through ... All 5 IBs failed, no data transfer for about 10 images. MIke Fitzpatrick notified (email); he responded in a few minutes, caused by a reboot of the DTS machine in Tucson.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
8.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-12-21 | 8.25 | 0.0 | 0.0 | 0.0 | 0.0 | 8.25 |
DES Night Summary is found at: http://des-ops.fnal.gov:8080/nightsum/nightsum-2016-12-21/nightsum.html