Date:
Monday, November 21, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Yuanyuan Zhang
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Stephanie Hamilton, Agnes Fertes
Problems:
In the first 1 hour 9:30 pm to 10:30 pm, pointing centering keeps sliding from R.A. correction < -3" after pointing correction to R.A correction > -20" in 1 hour.
At 2 am, raised the dome Louvre because of increasing wind speed above 10mph
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-11-21 | 7.75 | 0.0 | 0.0 | 0.0 | 0.0 | 7.75 |
Details See DES nightsum report:
http://des-ops.fnal.gov:8080/nightsum/nightsum-2016-11-21/nightsum.html