Date:
Sunday, March 27, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Lori Allen
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
David James, Frank Valdes (remotely)
Problems:
RASICAM stopped updating for about an hour. Alberto managed to restore connection.
No DIMM measurements since ~2:50 UT (about midnight local time).
At about 6 am local, lost 6 minutes when DECALS crashed (no update on flat field lamp status).
Program:
Proposal:
2013B-0536
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam NEO
Primary Investigator:
L. Allen
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-03-27 | 10.5 | 0.0 | 0.0 | 0.0 | 0.0 | 10.5 |
Microwave in control room kitchen has stopped working.
RASICAM looks like it needs a new flat field.
Latest TASCA image is from July 21, 2015.