Problems:
Dome very stiff and would not move under TCS control. We left it disabled which meant I could observe at dec -28C from zenith to the west.
Program:
Proposal:
Engineering
Target of Oportunity:
No
Time Observed:
5.25
Time Engineering:
0.0
Time lost technical:
2.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Observed Chandra Deep Field in N964 filter mostly
Primary Investigator:
ALISTAIR WALKER
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-12-23 | 5.25 | 0.0 | 2.5 | 0.0 | 0.0 | 7.75 |
None.