You are here

ENR CTIO Blanco 4-m 2015-08-01

Primary tabs

Date: 
Saturday, August 1, 2015
Telescope: 
CTIO Blanco 4-m
Submitter: 
Kathy Vivas
Submitter Email: 
Observer Support: 
Manuel Hernandez
Night Assistant: 
Alberto Alvarez
Also Present: 
Leo Paredes, S Kent, J Marshall, Modrick
Problems: 

There was an interlock broken related with the GCS. Reset did not solve it but Configure did.

When changing to project 2015A-0322 I got an error about invalid Prop-ID. I was surprised since I used that Prop-ID successfully at the very beginning of the night. I soon realized that the semester A was officially over at midnight. I contacted Chris Smith on the phone. He confirmed that was the case and extended the expiration date of the project. Thanks Chris!

Following instructions from Klaus Honscheid, we tried the new sytem of GUIs based on firefox. We used it for observing during about 4.5h. All GUIs displayed correctly and had full functionality. However, after a couple of hours they started to get slower and slower. Observer console and Alarm History crashed once each. Around 12:30 I decided to get back to the Chrome GUIs. Details were sent to Klaus by e-mail.

Dome closed at 1am due to clouds.

Comments: 

I started the Star Flats requested for engineering. However, sky conditions degraded quickly and I decided to stop the script. Only u,r and half g were done. I will repeat the star flats tomorrow if the conditions allow it.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
0.80
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
2
2nd Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
0.80
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
3
3rd Quarter
Clouds: 
Overcast
Wind: 
Low
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
8
4th Quarter
Clouds: 
Overcast
Wind: 
Low
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
8
Program: 
Proposal: 
2013A-9999
Target of Oportunity: 
No
Time Observed: 
0.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam engineering
Primary Investigator: 
A Walker
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
0.75
Proposal: 
2015A-0397
Target of Oportunity: 
No
Time Observed: 
1.25
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Rest
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
1.25
Proposal: 
2015A-0322
Target of Oportunity: 
No
Time Observed: 
2.0
Time Engineering: 
0.0
Time lost technical: 
0.25
Time lost weather: 
6.0
Time lost other: 
0.0
Description: 
DECam Bulge Survey
Primary Investigator: 
M. Rich
Institution: 
UCLA
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
8.25
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2015-08-01 4.0 0.0 0.25 6.0 0.0 10.25