Date:
Thursday, January 8, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Niall MacCrann / David James
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Rodrigo Hernandez
Problems:
Two 4MAP failures, onje at 02:55 (DGH DAC1 and MAMC2) and one at 04:40 (MAMAC 6).
Also observer2 was very slow throughout, especially after midnight.
Some internet connection problems, including inability to submit this report
Program:
Proposal:
DES2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.25
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
The DECam Legacy Survey of the SDSS Equatorial Sky
Primary Investigator:
David Schlegel and Arjun Dey
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-01-08 | 7.25 | 0.25 | 0.0 | 0.0 | 0.0 | 7.5 |
None.