ENR CTIO Blanco 4-m 2014-09-29

Primary tabs

Date: 
Monday, September 29, 2014
Telescope: 
CTIO Blanco 4-m
Submitter: 
Diego Capozzi
Submitter Email: 
Observer Support: 
Alberto Alvarez
Night Assistant: 
Leonardo Paredes
Also Present: 
Andres Plazas, Chris Davis and Diego Capozzi
Problems: 

The observing started at 21:10 local time, later than normally, due to presence of precipitation in the sky at East. The observing started once the weather situation reached stability. Because of the late start, the standards measurement was not carried out.

The rasicam and environment windows of the telemetry viewer haven’t been working properly since 19 UT of 29th of September until present time. In particular thay have been showing constant values. The problem has been reported to Anne Elliot who is looking into it. Anne said she is going to ask Klaus and Liz who have been working with the telemetry database in the past few days. Waiting for instructions.

Several technical problems:
1) Had to restart TCS (GUI and then APP) twice for solving problems related to the loss of environmental info in the telemetry screens.
2) Quick Reduce stopped continuously over all night and had to be reset each time.

Comments: 

None.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Thin Clouds
Wind: 
Medium
Seeing Value: 
0.90
Seeing Variability: 
0.4
Seeing Source: 
CTIO Seeing monitor
Sky : 
2
2nd Quarter
Clouds: 
Thin Clouds
Precipitation: 
High Humidity
Wind: 
Medium
Seeing Value: 
0.90
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
2
3rd Quarter
Clouds: 
Clear
Precipitation: 
High Humidity
Wind: 
Medium
Seeing Value: 
1.00
Seeing Variability: 
0.4
Seeing Source: 
CTIO Seeing monitor
Sky: 
2
4th Quarter
Clouds: 
Clear
Precipitation: 
High Humidity
Wind: 
Medium
Seeing Value: 
0.90
Seeing Variability: 
0.4
Seeing Source: 
CTIO Seeing monitor
Sky: 
2
Program: 
Proposal: 
2012B-0001
Target of Oportunity: 
No
Time Observed: 
9.25
Time Engineering: 
0.0
Time lost technical: 
0.25
Time lost weather: 
0.75
Time lost other: 
0.0
Description: 
Dark Energy Survey
Primary Investigator: 
Joshua Frieman
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Total Program Time: 
10.25
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2014-09-29 9.25 0.0 0.25 0.75 0.0 10.25