Date:
Wednesday, May 7, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Herve Bouy
Submitter Email:
Observer Support:
Kathy Vivas
Night Assistant:
Claudio Aguilera
Problems:
At ~UT04:35 the Interlock failed. After a reset, it failed again. We tried a Reset+Configure but it froze. The TO and SA rebooted the SISPI, but it failed again, this time indicating that the DECAL was not ready. Restarting the DECAL solved the problem. Observations resumed at ~UT05:15.
General power failure at UT09h15. Losing the last hour of observations
Program:
Proposal:
20014A-0035
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
1.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
Complementing Gaia from the Ground
Primary Investigator:
H. Bouy
Email:
Institution:
Center for Astrobiology, Madrid
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
9.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-05-07 | 8.0 | 0.0 | 1.75 | 0.0 | 0.0 | 9.75 |
None.