Date:
Tuesday, January 21, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Peter Nugent
Submitter Email:
Observer Support:
Humberto Orrego
Night Assistant:
Alberto Alvarez
Also Present:
Claudio Bruderer, Ricardo Munoz (second half)
Problems:
None.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
3.75
Proposal:
2013B-0614
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
Munoz
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
3.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-01-21 | 7.5 | 0.0 | 0.0 | 0.0 | 0.0 | 7.5 |
*********************
No problems in second half of the night.