Date:
Wednesday, November 13, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Marisa Cristina March
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Leonardo Paredes
Also Present:
Matt Wiesner
Problems:
# Problems starting RASICAM - resolved by manual creation of missing folder.
# sispi (PSL) interlock failure - part of focal plane missing in image (backplane 1). Problem solved by reseting and re-configuring sispi. (Occured twice.)
# Shutter box error - occurred twice - resolved by ICS shutter restart.
# Quick Reduce problem resolved - working as expected.
# Internet dropout / voip telephone dropout during day.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
8.75
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
9
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-11-13 | 8.75 | 0.0 | 0.25 | 0.0 | 0.0 | 9 |
None.