Date:
Thursday, September 19, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
James Annis
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Joerg Dietrich
Problems:
primary mirror support failed at 2 airmasses.
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
6.0
Time lost technical:
0.25
Time lost weather:
4.5
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
10.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-09-19 | 0.0 | 6.0 | 0.25 | 4.5 | 0.0 | 10.75 |
None.