Date:
Saturday, August 31, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Richard Kron
Submitter Email:
Observer Support:
Alberto Alvarez
Night Assistant:
Leonardo Paredes
Also Present:
David James, Ann Elliott, Steve Kent
Problems:
4maps failed once, and was reset.
2 interlock-breaking incidents in SISPI. The first required re-startting SISPI because of a digitization error. The second was the GCS interlock breaking, fixed by reconfiguring GCS instance.
Program:
Proposal:
2012B-0001
Target of Oportunity:
yes
Time Observed:
6.75
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
3.5
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-08-31 | 6.75 | 0.0 | 0.5 | 3.5 | 0.0 | 10.75 |
None.