Date:
Sunday, March 3, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Ryan Chornock
Submitter Email:
Observer Support:
Mauricio Rojas
Night Assistant:
Leonardo Paredes
Problems:
We lost an hour at the beginning of the night. There was a problem with TCS and Mauricio had to restart some things to get going. When TCS came back up, we had a software interlock problem with the GCS_STATUS that was not solvable with restarting GCS from the architect console. This ended up being fixed by killing and restarting SISPI.
Program:
Proposal:
2013A-0214
Target of Oportunity:
No
Time Observed:
2.0
Time Engineering:
0.0
Time lost technical:
1.0
Time lost weather:
5.5
Time lost other:
0.0
Description:
DECam LIGO Pilot Survey
Primary Investigator:
Edo Berger
Email:
Institution:
Harvard
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-03-03 | 2.0 | 0.0 | 1.0 | 5.5 | 0.0 | 8.5 |
None of the problems at the beginning mattered much because the night was very cloudy.