You are here

ENR CTIO Blanco 4-m 2013-01-29

Primary tabs

Date: 
Tuesday, January 29, 2013
Telescope: 
CTIO Blanco 4-m
Submitter: 
Lyndsay Old
Submitter Email: 
Observer Support: 
Mauricio Rojas
Night Assistant: 
Claudio Aguilera
Also Present: 
MSS, MS, PR, AK, AvdL, DA
Problems: 

 

1) 21:32 local time. After taking junk exposure DECam_00173289 there was a temporary error 'supply pressure too low', reset but and everything was okay for a moment or two but now problem has occurred again. Restarting FCM role, re-configuring, this is fixed.

2) Issue with the standard star field scripts e.g some scripts did not define the RA and DEC position to slew to for the first exposure on the script. Also repeated the telescope position for each filter in a script caused TCS error message.

----

2nd half:

- Observer Consoler crashed several times (froze or displayed error message)

- guider GUI froze (but guider kept working); started a second VNC window, after a while, this one spontaneously started working again

- telescope goes "clunk" when crossing meridian (bad PSF and ellipticity); this leads to loss of guider info

Comments: 

We ran out of chairs in the control room...

Conditions: 
General Conditions
Temperature Max: 
16.30
Temperature Min: 
15.30
Humidity Max: 
50
Humidity Min: 
38
Wind Speed Max: 
4.00
Wind Speed Min: 
0.00
Comment: 
None.
1st Quarter
Clouds: 
Clear
Seeing Value: 
1.40
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky : 
0
2nd Quarter
Clouds: 
Clear
Seeing Value: 
1.20
Seeing Variability: 
0.4
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.00
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
Program: 
Proposal: 
2012B-0003
Target of Oportunity: 
No
Time Observed: 
3.5
Time Engineering: 
0.5
Time lost technical: 
0.25
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Frieman
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
4.25
Proposal: 
2013A-0360
Target of Oportunity: 
No
Time Observed: 
4.5
Time Engineering: 
0.0
Time lost technical: 
0.25
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Anja von der Linden
Institution: 
KIPAC
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
4.75
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2013-01-29 8.0 0.5 0.5 0.0 0.0 9