You are here

ENR CTIO 1.5-m 2023-07-26

Primary tabs

Date: 
Wednesday, July 26, 2023
Telescope: 
CTIO 1.5-m
Submitter: 
Roberto Aviles
Submitter Email: 
Observer Support: 
Hernan Tirado
Night Assistant: 
None
Problems: 

HDD of the Linux / TCS machine seems to be broken, it is not booting. Humberto Orrego have the details.

Comments: 

- Found both the telescope and dome pointing away from the zenith. After recovering those positions found that, anyway, the Linux/TCS machine is down.

- CHIRON afternoon calibrations failed after the file number 54 (out of the 116 expected.) CHIRON was FROZEN, restarted it.

- Restarted CHIRON, did some tests in Slicer as well as in Fiber mode, the system seems to be fine (check files test*fits.) However number of 'counts' (EMAVGSQ) a bit unstable.

- Left the morning calibrations (CALIB2) running as a way to stress / test the CHIRON system.

- DIMM and / or RINGSS are (apparently) down.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Cirrus
Wind: 
Low
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky : 
4
2nd Quarter
Clouds: 
Clear
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
Program: 
Proposal: 
K Kids
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
0.0
Time lost technical: 
11.5
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Todd Henry
Institution: 
SMARTS
Instrument: 
CTIO 1.5m Echelle
Organization: 
SMARTS
Total Program Time: 
11.5
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2023-07-26 0.0 0.0 11.5 0.0 0.0 11.5