Date:
Monday, February 27, 2023
Telescope:
CTIO 1.5-m
Submitter:
Roberto Aviles
Submitter Email:
Observer Support:
None
Night Assistant:
None
Problems:
03:30 UT Sent to 'T0166527623' but track failed and telescope went down East : recovered.
Program:
Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.25
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-02-27 | 9.25 | 0.0 | 0.5 | 0.0 | 0.0 | 9.75 |
DIMM data gap: 01:13 - 02:42 UT
09:05 UT a smooth earthquake, it did not impact the integration (file 1147.)
Completed the program with the Sun at -12.4 degrees of altitude.