Date:
Friday, October 7, 2022
Telescope:
CTIO 1.5-m
Submitter:
Roberto Aviles
Submitter Email:
Observer Support:
None
Night Assistant:
None
Problems:
04:30 UT: ZPOINT or problem w/ encoder? RA changed (in header and TCS): check files 1137 (ok) versus 1138!
Stopped 1138 at 25' and verified ZPOINT: apparently spectra are the same and ok.
Summary: file 1138, header and TCS display different RA (~30' diff) but spectra are 'ok'.
08:00 UT OPTGUI frozen once integration starts, rebooted OPTGUI 4 times, OK??? (08:15 UT "ASYNC ERROR, DHE warning AFE2HV-I above allowed range (166.990291 [ps] << chiron") ??? This message keeps appearing after deleted from 'Last Async / Error'
Program:
Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2022-10-07 | 9.75 | 0.0 | 0.5 | 0.0 | 0.0 | 10.25 |
Beginning of Night: cirrus coming from SW. Also: CTIMAC4 crashed/recovered.
End of night (~08:30 UT) very thin clouds from SW.
DIMM data gaps 00:30 - 00:59, 08:05 - 08:22 UT
More instances of ' dome and telescope out of sync', even once the telescope is in place!
Please reschedule : 'TOI-618' and 'HD72673'.
Last integration ('gamma Vel') ended with the Sun at -9.1 degrees of altitude.