Date:
Tuesday, July 15, 2025
Telescope:
CTIO Blanco 4-m
Submitter:
Guy Stringfellow (1st half) Tomas Ahumada (2nd half)
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Roberto Aviles
Also Present:
Rodrigo Hernandez, K. Boutsia, G. Damke
Problems:
Three interlock SISPI (GCS) broken errors during thefirst half of the night. Lost 3 images.
Second half:
Shutter synchronization error:
5:19
6:26
6:52
around 7:30 lost ~30 min to SISPI error
8:05
9:30
Program:
Proposal:
2019A-0305
Target of Oportunity:
No
Time Observed:
5.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
2.5
Time lost other:
0.0
Description:
DECam local volume exploration survey
Primary Investigator:
Alex Drlica-Wagner
Email:
Institution:
The University of Chicago
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8
Proposal:
2025A-898810
Target of Oportunity:
No
Time Observed:
5.5
Time Engineering:
0.0
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
A volumetric increase of ZTF searches
Primary Investigator:
Tomas Ahumada
Email:
Institution:
California Institute of Technology
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
6.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2025-07-15 | 11.0 | 0.0 | 1.0 | 2.5 | 0.0 | 14.5 |
Multiple SISPI synchronization errors
Roberto and Rodrigo tried their best to solve the software issues, and only in one occasion it took more than 5 min (30 min)