Date:
Wednesday, May 7, 2025
Telescope:
CTIO Blanco 4-m
Submitter:
Zhen Guo
Submitter Email:
Observer Support:
Sean Points
Night Assistant:
None
Problems:
Problem with the CCD, there were a few stripes on the CCD. Sometimes the scripts didnt work. Had to re start the script. There was one time the focus didnt work on the NEWFIRM GUI, I had to ask the operator to change it from the telescope control. Cloudy after 5 am.
Program:
Proposal:
2025A-599150
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
1.5
Time lost other:
0.0
Description:
VVV RENEW
Primary Investigator:
Zhen Guo
Email:
Institution:
Universidad de Valparaiso
Instrument:
CTIO 4m Newfirm
Organization:
Chile
Total Program Time:
11.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2025-05-07 | 8.5 | 0.0 | 1.5 | 1.5 | 0.0 | 11.5 |
None.