Date:
Tuesday, March 25, 2025
Telescope:
CTIO Blanco 4-m
Submitter:
Rinat Damari
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Roberto Aviles, K. Boutsia
Problems:
6:12 - there was an issue with the telescope breaks, the TO brought telescope to zenith and then did a reset/configure at SISPI ~10 min lost
Program:
Proposal:
2025A-227091
Target of Oportunity:
yes
Time Observed:
1.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Search, discovery and follow up of electromagnetic counterparts of gravitational wave events
Primary Investigator:
Marcelle Soares-Santos
Email:
Institution:
University of Zurich
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
1
Proposal:
2025A-729671
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DESI Transient Survey
Primary Investigator:
Palmese
Email:
Institution:
Carnegie-Mellon University
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
8
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2025-03-25 | 9.0 | 0.0 | 0.0 | 0.0 | 0.0 | 9 |
There was a visulization problem (~ 5:45) in SISPI GUI (the screen got frozen), so for ~20 min I did not see nothing, then we opened new windows.