Date:
Wednesday, November 6, 2024
Telescope:
CTIO Blanco 4-m
Submitter:
Rodrigo Haack:1st half, Mainak Singha:2nd half
Submitter Email:
Observer Support:
Rodrigo Hernandez
Night Assistant:
Claudio Aguilera
Also Present:
Chris Haines, Alfredo Zenteno and Ricardo Demarco
Problems:
Problems of comunication between SISPI. Interlock and OCS lost communication. Due to this, we tried to recover the system through RESET and CONFIGURE(twice), but it did not work.
Also, an error popped up with a reference to PANG and PLM. Finally, it was necessary to restart SISPI and all came back to work properly.
Program:
Proposal:
2024B-591619
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
Abell 2744
Primary Investigator:
Ricardo Demarco
Email:
Institution:
Universidad Andres Bello
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
4.25
Proposal:
2023B-502332
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
CIDER
Primary Investigator:
Sangeeta Malhotra
Email:
Institution:
NASA Goddard Space Flight Center
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2024-11-06 | 8.0 | 0.0 | 0.25 | 0.0 | 0.0 | 8.25 |
None.