Date: 
Wednesday, September 4, 2024
Telescope: 
CTIO Blanco 4-m
Submitter: 
Paulina Troncoso
Observer Support: 
Hernan Tirado
Night Assistant: 
Alberto Alvarez
Also Present: 
Kathy Vivas
Problems: 

General internet outage. Zoom connection was lost. Fortunately we were observing via Keeper and that connection was not lost. After a while however SISPI started to give errors (can't communicate with shutter). Interlocks were usually cleared with a Configure, although a SISPI restart was needed in one instance. It was suspected that this was due to network problems. When finally the internet was recovered, all worked fine.

 

Comments: 

We tested remote observing with Keeper tonight. Petri Garagorry and Chris Morrison were present. It was a positive experience although we took note of several details that need to be solved before launching this mode of observation.

There were no problems for the second half of the night.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Seeing Value: 
1.30
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky : 
0
2nd Quarter
Clouds: 
Clear
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
Program: 
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
0.0
Time lost technical: 
1.5
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
A Drlica-Wagner
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Total Program Time: 
1.5
Proposal: 
2024B-332522
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
ODIN
Primary Investigator: 
Paulina Troncoso
Institution: 
Universidad Central de Chile
Instrument: 
CTIO 4m DECam
Organization: 
Chile
Total Program Time: 
0
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2024-09-04 0.0 0.0 1.5 0.0 0.0 1.5