Date:
Monday, February 19, 2024
Telescope:
CTIO Blanco 4-m
Submitter:
Ben Cassese
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Rodrigo Hernandez
Also Present:
K. Boutsia
Problems:
There was a SISPI interlock, the telescope had to be moved to zenith and TCS was restarted - 15min lost
Program:
Proposal:
2024A-715816
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
TESS solar system follow up
Primary Investigator:
Ben Cassese
Email:
Institution:
Columbia University
Instrument:
CTIO 4m DECam
Total Program Time:
8.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2024-02-19 | 8.25 | 0.0 | 0.25 | 0.0 | 0.0 | 8.5 |
None, the issues were resolved promptly.