Date:
Saturday, November 4, 2023
Telescope:
CTIO Blanco 4-m
Submitter:
Gautham Narayan
Submitter Email:
Observer Support:
Wilson Liu
Night Assistant:
Alberto Alvarez
Problems:
One issue with hexapod- "allowable current, general amplifier fault" - needed a quick reset. Image 01252325 was not readout. Took maybe 5 min total.
Program:
Proposal:
2020B-0288
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Merian Survey
Primary Investigator:
Alexie Leauthaud
Email:
Institution:
University of California, Santa Cruz
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Proposal:
2023B-735801
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DESIRT/DECAT
Primary Investigator:
Antonella Palmese
Email:
Institution:
Carnegie-Mellon University
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-11-04 | 8.0 | 0.0 | 0.0 | 0.0 | 0.0 | 8 |
None.