Date:
Sunday, January 29, 2023
Telescope:
CTIO Blanco 4-m
Submitter:
Gautham Narayan (1st half), Clara Martinez-Vazquez (2nd half)
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Problems:
There was an Interlock DECam/SISPI broken alarm at 05:15 UT. It said "Component(s) not ready for exposure: TCSINTERFACE". Alberto did a reset and it was fixed. No time was lost. We don't know why we had this error.
CTIO Site Monitoring website wasn't giving any DIMM seeing values.
Program:
Proposal:
2021B-0909
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Twilight Asteroids/DECAT
Primary Investigator:
Scott Sheppard
Institution:
Carnegie Institution of Washington
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-01-29 | 8.5 | 0.0 | 0.0 | 0.0 | 0.0 | 8.5 |
None.