Date:
Tuesday, December 7, 2021
Telescope:
CTIO Blanco 4-m
Submitter:
Yun Huang
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Problems:
at 6:52 UT after a slew the tracking failed. Alberto had to reset the RA drive tachimeter and restart them. Lost 30 minutes.
Program:
Proposal:
2021B-0906
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Broadband observation of SHELA field
Primary Investigator:
Lucia Guaita
Email:
Institution:
Universidad Andres Bello
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
3.75
Proposal:
2019A-0308
Target of Oportunity:
No
Time Observed:
3.0
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
LoVoCCS The Local Volume Complete Cluster Survey
Primary Investigator:
Ian Dell'Antonio
Email:
Institution:
Brown University
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2021-12-07 | 6.75 | 0.0 | 0.5 | 0.0 | 0.0 | 7.25 |
(see above)