Date:
Saturday, March 7, 2020
Telescope:
CTIO Blanco 4-m
Submitter:
Agustin Diaz
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Hugo Prado, Kathy Vivas (second half)
Problems:
Not calibrations today. Communication problem with DECal continues.
Program:
Proposal:
2020A-0399
Target of Oportunity:
No
Time Observed:
4.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
The DECam eROSITA Survey (DeROSITAS)
Primary Investigator:
Alfredo Zenteno
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.75
Proposal:
2020A-0058
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Is Crater II disrupting?
Primary Investigator:
K. Vivas
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2020-03-07 | 9.75 | 0.0 | 0.0 | 0.0 | 0.0 | 9.75 |
None.