Date:
Friday, December 13, 2019
Telescope:
CTIO Blanco 4-m
Submitter:
Di Wen
Submitter Email:
Observer Support:
Tim Abbott
Night Assistant:
Alberto Alvarez
Also Present:
Jianyang Fu
Problems:
For some reason, the RA offset correction did not work for about ten minutes when the observing support tried to apply a correction.
At 4:27 UT, when we asked for Master Control remotelly from La Serena, The Interlocl and OCS lights became red. Then, when Alberto gave us control, they became green and the exposure that was aborted was restarted.
At 04:33 UT, the next images in the queue didn't require a slew, but SISPI too very long to start exposing.
Program:
Proposal:
2019B-0910
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Monitoring of AGN Variability
Primary Investigator:
Yue Shen
Email:
Institution:
University of Illinois at Urbana-Champaign
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.5
Proposal:
2019B-0323
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
The DECam eROSITA Survey
Primary Investigator:
Alfredo Zenteno
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-12-13 | 7.25 | 0.0 | 0.0 | 0.0 | 0.0 | 7.25 |
None.