Date:
Monday, April 15, 2019
Telescope:
CTIO Blanco 4-m
Submitter:
Nicole David
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Jackie Seron
Problems:
The linear actuators of M2 wasn't responding.
The hard point B1 light was off.
The night was lost
Program:
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-04-15 | 0.0 | 0.0 | 10.5 | 0.0 | 0.0 | 10.5 |
None.