Date:
Sunday, September 2, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Zachary Slepian
Submitter Email:
Observer Support:
Clara Martinez-Vazquez
Night Assistant:
Claudio Aguilera
Also Present:
Hernan Tirada
Problems:
Around 09:49 UT, roughly 20 minutes before end of the night, our script seems to have requested an inaccessible pointing and the chicken went off; interlock broke. We reset, removed one exposure from the script, and tried again. Got one more exposure, but then script said it had no more in it. Unclear if that really was the end of our planned observations for the night or not. But this is probably an issue with the script, not the instrument.
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
10.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECaLS
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.25
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-09-02 | 10.25 | 0.0 | 0.0 | 0.0 | 0.0 | 10.25 |
See above. Also chip n10 continues to be broken.