You are here

ENR CTIO Blanco 4-m 2018-05-12

Primary tabs

Date: 
Saturday, May 12, 2018
Telescope: 
CTIO Blanco 4-m
Submitter: 
Elodie Savary
Submitter Email: 
Observer Support: 
Hernan Tirado
Night Assistant: 
Claudio Aguilera
Also Present: 
Alfredo Zenteno
Problems: 

19:50 connection between SISPI (observer1) and observer 2 was lost because observer2 was rebooting itself this afternoon, so we had to restart SISPI to reconnect both machines.

12:04-12:21 DECAL problem. We restarted the machine because it was unresponsibe.  SISPI did not crash this time and a new sound alarm was heard, a sheep complaining.   We took a zero after the DECAL machine was restarted and the filter stayed in the g-band position instead of the block position.  

12:29 occlusion problem with image 745744

3:35 occlusion problem with image 745799

5:58 no guiding

6:09 occulsion problem with image 745837

6:09 no guiding 

 

Comments: 

None.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.40
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
2
2nd Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.30
Seeing Variability: 
0.4
Seeing Source: 
The Telescope I used
Sky: 
3
3rd Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.70
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
3
4th Quarter
Clouds: 
Cirrus
Wind: 
Low
Seeing Value: 
1.70
Seeing Variability: 
0.4
Seeing Source: 
The Telescope I used
Sky: 
5
Program: 
Proposal: 
2014B-0404
Target of Oportunity: 
No
Time Observed: 
7.75
Time Engineering: 
0.0
Time lost technical: 
0.5
Time lost weather: 
3.0
Time lost other: 
0.0
Description: 
DECAlS
Primary Investigator: 
David Schlegel
Institution: 
EPFL
Instrument: 
CTIO 4m DECam
Total Program Time: 
11.25
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2018-05-12 7.75 0.0 0.5 3.0 0.0 11.25