Date:
Saturday, May 12, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Elodie Savary
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Alfredo Zenteno
Problems:
19:50 connection between SISPI (observer1) and observer 2 was lost because observer2 was rebooting itself this afternoon, so we had to restart SISPI to reconnect both machines.
12:04-12:21 DECAL problem. We restarted the machine because it was unresponsibe. SISPI did not crash this time and a new sound alarm was heard, a sheep complaining. We took a zero after the DECAL machine was restarted and the filter stayed in the g-band position instead of the block position.
12:29 occlusion problem with image 745744
3:35 occlusion problem with image 745799
5:58 no guiding
6:09 occulsion problem with image 745837
6:09 no guiding
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
3.0
Time lost other:
0.0
Description:
DECAlS
Primary Investigator:
David Schlegel
Email:
Institution:
EPFL
Instrument:
CTIO 4m DECam
Total Program Time:
11.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2018-05-12 | 7.75 | 0.0 | 0.5 | 3.0 | 0.0 | 11.25 |