Date:
Tuesday, February 13, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Satya Gontcho A Gontcho
Submitter Email:
Observer Support:
Alberto Alvarez
Night Assistant:
Hernan Tirado
Problems:
Mousquitoes in the control room.
The mouse of observer 1 desk kept on stopping to work, Alberto had to change the battery.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.25
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
5.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECaLS
Primary Investigator:
Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2018-02-13 | 8.75 | 0.0 | 0.0 | 0.0 | 0.0 | 8.75 |
Link to DES Night Summary: http://des-ops.fnal.gov:8080/nightsum/nightsum-2018-02-13/nightsum.html
Good run, Thanks !